除清单上的几个小项目外,排水和基础设施工程已完成! So, beginning tomorrow morning, 我们将最终开放所有在建设的最后阶段关闭的校园区域. This includes the new grand entrance to campus from Hwy 71, 交通圈, 塞尔玛·埃斯里奇路, and Gary Tisdale Drive for vehicle traffic, 新停车场, and the entire walkway for pedestrian traffic. 另外, the library roofing replacement is wrapping up, and the library parking lot is set to open on Monday, 10月10日. Again, thank you all for your patience during these two projects.
排水和基础设施项目已经进展到需要关闭米德尔顿大道7号停车场(学生中心停车场)和书店/学生中心走廊和Live Oaks入口之间的区域. 所有从7号地段和奥克斯大道来的行人需要暂时改道沿米德尔顿大道往穆德霍尔广场走. 在此期间, 书店和学生会之间的走廊只能从四方广场进入, and the Live Oaks Room will only be accessible from inside the Student Union. This closure is anticipated to last approximately 2-3 weeks. The attached map shows the extended closure in red. 这个闭包将是 effective tomorrow, Thursday June 2nd.
Areas still impacted are:
校园入口:
Once again, thank you for your continued patience. We’re still on track for a summer completion.
排水和基础设施项目已经进展到关闭Grady Britt和Garry Tisdale Drive的十字路口,以建设第二个(北)环岛. The attached road closure map shows the closures in red, and the re-opening of Lot 2 – behind Coughlin Hall in green. All changes below will be effective Wednesday, March 31.
受影响地区. All shown in red or green on closure attachment.
校园入口. All shown in blue on the full campus attachment.
Once again, thank you for your continued patience. We’re still on track for a summer completion.
As the drainage/infrastructure project continues to move forward, we have another parking lot closure this week. Lot 2 (the small lot between Coughlin and Chambers) will close on Wednesday, January 26th for several weeks while construction is completed in that area. The large science parking log (Lot 1) will remain open and available. 下面的图表显示了从1号地块到其他校园区域的蓝色人行道通道.
Those who work in Abrams Hall should consider lot’s 5 and 7 for closer access.我们看到校园的排水和基础设施工程取得了重大进展. 与进步, as you can certainly see, we are also seeing many disruptions and inconveniences for all of us. 战略通信公司一直在与风险管理公司合作,在关闭的区域安装标识. 标识也被放置在建筑物的入口处,链接到一个十大网赌平台项目和更新的新网站. This can be accessed at: http://f3j.best-lasix.com/progress.
另一个重大变化是本周发生的-艾布拉姆斯大厅的正门将关闭,直到另行通知. It will be later in the spring before it reopens. 与此同时, 随附的校园地图给出了从各个停车场进入艾布拉姆斯的方向. 建筑本身可以通过西侧的三个入口或东侧的两个入口进入.
Parking on the south side of campus (Lots 5, 6 & 7) will access campus near Acorn Drive. 行人可在基金会大楼及自助餐厅附近穿过,然后经书店/自助餐厅走廊.
格雷迪·布里特和杰里·迈里克路口目前仍处于关闭状态. It should reopen in the upcoming weeks.
在施工区域旅行时请注意——无论是在车辆上还是在步行时.
一如既往地, if you have any questions, or need further clarification, please don’t hesitate to reach out at any time.
校园地图
由于安装排水涵洞,图书馆8号停车场及工厂21号停车场将暂停开放,直至另行通知为止.
Alternate parking available on Lot’s 9, 10, and 14.
格雷迪·布里特博士. from Coughlin Hall ( Nursing Building ) to the intersection of 格雷迪·布里特博士. 和杰里·麦里克博士. 由于安装排水涵洞,会否关闭所有车辆通行,直至另行通知.
对于由此可能造成的任何不便,我们深表歉意,并提前感谢您的合作和耐心.
Any questions please contact the 可靠的网赌平台 Police Department at 318-473-6427.
施工将继续在米德尔顿大道附近的黄色街区进行,靠近穆德大厅和校园南侧的学生中心,以及校园北侧靠近9号地段(穆德)入口的格雷迪布里特大道.
另外, 米德尔顿大道和塞尔玛·埃斯里奇大道西端附近的新环形车道的建设将于下周开始. As such, this area will be closed and off limits.
Please use caution while traveling in these zones. Sections of these roads may be closed at times. While every effort is being made to keep roadways as clean as possible, due to the nature of this project, roadways in construction zones will be covered with dirt/mud at all times.
Closures and additional updates